mardi 23 juin 2026

260623 ALCYONE FOR SALE: HISTORY OF ALCYONE FROM 2004 to 2026 (ENGLISH)

NOTE: The French version contains considerably more detail on this post of the blog:

260320 ALCYONE – COMPLETE INVENTORY & HISTORY (French draft currently being updated)

1) ALCYONE'S HISTORY BEFORE 2017 

ALCYONE is hull number 26 of the series and one of the last five Outremer 55 Lights ever built. As such, she benefited from all the experience accumulated from the previous boats, both in design and construction.

She is something of a survivor, having had a difficult start to her life. The Outremer shipyard itself ultimately rescued her and brought her back from the Indian Ocean after six years of operation, demonstrating its confidence in both the strength of her structure and the quality of the design.

The hull identification engraved on the starboard hull confirms that ALCYONE was the last Outremer 55 Light launched during the lifetime of designer Gérard Danson.

2003–2004: A Dream Shared by Four Partners

Delivered in April 2004, the catamaran was commissioned by four legal professionals (lawyers and notaries) who planned to operate her as a charter yacht in tropical waters.

To support this objective, she was configured with:

  • Simple systems that could be maintained anywhere in the world.
  • Conventional shaft-drive propulsion.
  • Large water capacity for extended autonomy.
  • Four spacious and symmetrical guest cabins.
  • Crew berths in the forward compartments.
  • Discreetly integrated equipment intended for charter use.
  • A simple, robust sail inventory.
  • A high-performance SSB radio system for long-distance communications.

After several cruises in the Mediterranean, ALCYONE departed for the Seychelles via the Red Sea.

2004–2008: The Reality of Charter Operations in the Seychelles

Following only limited charter activity, the project was largely abandoned.

Eventually the Outremer shipyard decided to bring the boat back to France. This proved beneficial for everyone involved:

  • The original owners recovered part of their investment.
  • Outremer acquired the vessel at a reasonable cost.
  • Future owners—including ourselves—benefited from the opportunity.
  • And the boat itself was given a second life.

One may wonder whether such an operation would still be possible today.

2009: Return to La Grande Motte via South Africa

In her existing condition, ALCYONE was delivered back to France by Jean-Pierre Balmes, Outremer's in-house skipper, assisted by two friends from the Seychelles.

The route took her via Cape Town and Brazil before arriving at La Grande Motte.

2010–2011: Major Refit at Outremer

The boat was hauled out at the Outremer yard for a major refit before being offered for sale.

The 2015 survey report (available upon request) specifically references the extensive 2011 refit carried out by the shipyard.

2012: Purchased by François for a New Family Adventure

François purchased ALCYONE directly from the Outremer yard, beginning the second chapter of her life.

2013–2014: Atlantic and Pacific Crossing via Panama

Launched in May, François and his two children undertook an extraordinary voyage covering nearly half a circumnavigation:

  • Canary Islands
  • Cape Verde
  • St Martin and the Caribbean
  • Mexico
  • Panama Canal
  • Galápagos Islands
  • Marquesas Islands
  • Fakarava (Tuamotu Islands)

The boat then spent:

  • Two months ashore in Tahiti for maintenance and a return trip to France.
  • Three months ashore at Norsand Boatyard in Whangarei, New Zealand, for similar maintenance work.

2015: New Zealand Refit and New Caledonia Season

  • First three months of the year ashore at Norsand Boatyard, Whangarei.
  • Relaunched in April.
  • Cruising season in New Caledonia.
  • Returned to Whangarei in September.
  • The owner put the boat up for sale and returned to France.

2016: Storage Ashore in New Zealand

ALCYONE remained stored ashore at Norsand Boatyard in Whangarei throughout 2016 while awaiting her next owner.

We eventually purchased her in January 2017.


With 40 knots of wind off San Francisco: strong wind, flat water, third reef, 18–22 knots of boat speed.

2) ALCYONE'S HISTORY SINCE 2017 

2017: Refit (Part 1) and First Season in Melanesia

January to April

Cleaning and first essential refit.

Approximately 1,200 man-hours spent ashore in Whangarei and Auckland.

(Blog entries 1702–1704)

May to October

Sea-trial cruising season: first season in Melanesia.

  • New Zealand → Fiji (blog 1705–1711)
  • Fiji → New Caledonia (blog 1711)
  • New Caledonia → New Zealand, single-handed return to the Whangarei dry dock (blog 1711)

2018: Refit (Part 2) and Second Season in Melanesia

March to April

Second refit in Whangarei.

Approximately 800 man-hours dedicated to rigging upgrades and improvements identified during the first season.

(Blog entries 1803–1804)

May to November

Second Melanesian cruising season.

  • New Zealand → Fiji (blog 1805–1808)
  • Fiji → New Caledonia (full circumnavigation of New Caledonia, blog 1809–1810)
  • New Caledonia → New Zealand (blog 1811)
  • Cruising northern New Zealand before returning to the Whangarei dry dock at the end of November (blog 1811)

2019: Completion of the Refit and Departure for Canada and Mexico via the Southern Route

February to March

Dry dock in Whangarei.

Final preparation (approximately 200 man-hours) for the major challenge:

New Zealand → Canada

(Blog entries 1902–1904)

April

Final cruising season in New Zealand.

(Blog 1905)

May to June

Passage from New Zealand to Canada.

(Blog entries 1904–1907)

  • New Zealand → Raivavae (Austral Islands) via the Southern Ocean route, with a two-week stopover.
  • Raivavae → Amanu (Tuamotu Islands), four-day stopover.
  • Amanu → Hilo (Hawaii), passing the Marquesas without stopping, three-day stopover in Hilo.
  • Hawaii → Canada.

July to September

Cruising British Columbia and circumnavigation of Vancouver Island.

(Blog entries 1908–1909)

October

Pacific Northwest and California.

(Blog 1910)

November to December

Cruising Baja California, Mexico.

(Blog entries 1911–1912)


2020: COVID Break – Puerto Peñasco Dry Dock (Mexico)

Preventive hull protection and epoxy treatment.

January to March

Cruising Baja California before a rush to CABRALES Boatyard in Puerto Peñasco.

Emergency return to France aboard one of the last Air France flights departing Mexico, via Mexicali.

(Blog entries 2001–2004)

April to December

ALCYONE remained ashore without us for an extended period.

Work completed:

  • Complete hull sandblasting.
  • Preventive epoxy anti-osmosis treatment.

(Blog entries 200410–210119)


2021: French Polynesia – Beginning of Our Five-Year Partnership with Bertrand in Amanu

February to March

Return to CABRALES Boatyard, Puerto Peñasco.

(Blog entries 210115–210309)

March to April

Cruising down Baja California.

(Blog entries 210310–210424)

April to May

Passage from Puerto Vallarta, Mexico, to the Gambier Islands, French Polynesia.

(Blog entries 210423–210513)

May

Rikitea (Gambier Islands) → Amanu (Tuamotu Islands).

Beginning of our five-year partnership with Bertrand.

(Blog entries 210514–210521)

June 30 to August 5

Amanu.

August 6 to September 10

Amanu → Hao.

September 11 to 30

Hao → Tahanea → Kauehi → Toau → Tahiti with Bertrand.

October 1 to 5

Tahiti with Bertrand.

October to December

Tahiti → Amanu via the Tuamotu Islands with Bertrand.

(Blog entries 2110–2112)


2022: French Polynesia – Bertrand Partnership, Season 1

Visit from Jim (our son)

January to April

Amanu, then Amanu → Hao with Bertrand.

May 1 to 5

Hao → Amanu.

May 6 to August 10

Amanu.

Jim visited from Auckland between July 17 and August 19.

August 11 to 14

Passage from Amanu to Tahiti with Jim.

August 15 to 22

Maintenance period in Tahiti with Jim and Bertrand.

August 23 to December

Tahiti → Amanu via the Tuamotu Islands with Bertrand.

The scheduled haul-out was postponed.


2023: French Polynesia – Bertrand Partnership, Season 2

Visits from Philippe & Odile, then Jim

January to April

Amanu, then Amanu → Hao with Bertrand.

May 1 to 4

Hao → Amanu.

May 5 to June 9

Amanu, then Amanu → Hao with Philippe and Odile.

June 10 to 12

Hao → Amanu with Jim.

Jim stayed aboard from June 10 to July 2.

June 13 to July 2

Amanu with Jim.

July 3 to December 31

Amanu with Bertrand.


2024: French Polynesia – Bertrand Partnership, Season 3

Visit from Laurent

January to May 14

Amanu, then Amanu → Hao with Bertrand.

May 15 to 17

Hao → Amanu.

May 18 to June 18

Amanu.

Laurent visited from June 11 to June 23.

June 19 to 23

Amanu → Tahiti with Laurent.

June 23 to December 15

Tahiti → Raiatea (haul-out) → Amanu via the Tuamotu Islands with Bertrand.


2025: French Polynesia – Bertrand Partnership, Season 4

Visit from Luc and Gislaine

January to May 13

Amanu, then Amanu → Hao with Bertrand.

May 14 to 17

Hao → Amanu.

May 18 to August 9

Amanu.

Luc and Gislaine visited from July 3 to July 16.

August 10 to December 31

Hao → Amanu with Bertrand.


Bertrand Partnership –  Season 5 (last)

With Gordon and Fiona 

(schedule accurate to within approximately three days)

January to May 16

Amanu, then Amanu → Hao with Bertrand.

May 17 to July 9

Hao and Amanu.

July 10 to 26 

Amanu with Gordon and Fiona.

July 27 to 31 

Passage from Amanu to Tahiti with Gordon and Fiona.

August 1 to 11 

Tahiti → Huahine → Raiatea with Bertrand, Gordon and Fiona.

August 11 to 16

Raiatea.

ALCYONE available for inspection.

August 17 to 20

Haul-out and survey at RCS Raiatea.

ALCYONE available for inspection.

August 21 to October 15

Raiatea.

ALCYONE available for delivery to her new owner.

October 15 to November 1

Return to Amanu or passage to the Marquesas Islands.

From November onward

Marquesas or Amanu 

ALCYONE ready for the long Auckland–Vancouver passage, with every piece of equipment weighed and the overall payload carefully managed (March 2019).



3)TWO INCIDENTS / 9 YEARS OF CRUISING 

1) FIJI, 2017 – STARBOARD BOW CRASH BOX DAMAGE
-   Cause: A manoeuvre was delegated to a crew member who was not yet familiar with disengaging the autopilot.
-   Repair: Temporary repairs were carried out locally, followed by a professional repair at Whangarei Boatyard two months later.
(See blog entry: "1709 – Crash at Musket Cove"

2) OFSHORE NEW ZEALAND, 2017 – MARTINGALE FAILURE DURING A SOLO PASSAGE
-   Location: Approximately 100 metres from the New Zealand coast after a solo passage
-   Cause: The Code 0 tack had been left secured on the bowsprit as weather conditions deteriorated overnight. A breaking wave loaded the sail and damaged the aluminium martingale structure.
-   Lesson learned: The tack line could have been recovered in a few seconds before conditions worsened. As every sailor knows, whether sailing alone or fully crewed, negligence is always paid for immediately at sea.
-   Repair: The final 100 miles were completed under engine power. The entire standing rigging was subsequently renewed at Whangarei.
(See blog entry: "1711 – Rough Solo Return to New Zealand")


4) IMPROVEMENTS OVER €500 SINCE 2021 

Bertrand and I agreed that ALCYONE should remain exceptionally well maintained,     stay permanently based in French Polynesia, and be improved every year.                        This has been achieved by reinvesting the savings generated through:                                • Continuous occupation and year-round onboard presence.                                                • Lower insurance costs (ALCYONE carries third-party liability insurance only).            • Reduced haul-out expenses (one haul-out every two years in Tahiti or Raiatea).              • Minimal marina fees (rarely used).                                                                                      

Prior to 2021, ALCYONE had already sailed extensively offshore. Since then, she has      spent even more time at anchor in remote atolls. This explains certain recurring.              replacements, such as the anchor chain. The cost of 60 metres of chain is roughly.             equivalent to one week in a marina, and the old chain is recycled onto our permanent    mooring.                                                                                                                                      

2021 - 2 days in marina Taina PAPEETE for new furler. 
• Replacement of the solent furler in Tahiti (original unit installed in 2011).
• Polynesian registration ("Papeetisation"), allowing the yacht to remain indefinitely in French Polynesia after payment of all applicable duties and taxes.


2022 - Haul-out in Tahiti
• Anchor chain replacement.
• Installation of an E-Wincher electric winch handle, allowing all winches to be powered when needed, making dinghy handling easier and mast climbing safer.

2023
• Replacement of the trampoline with a new unit built to the original Outremer specification.

2024 - Haul-out in Raiatea
• Replacement of the original 2003 Lofrans 1200W windlass with a new Lofrans Tigres 1500W.
• Anchor chain replacement.
• Replacement of rudder bearings/bushings.
• Replacement of the service battery bank with six AOKLY 100Ah gel batteries.
• Replacement of the mainsail Spectra purchase halyard.

2025
• Installation of a new Vulcan chartplotter/radar system operating independently from the Raymarine network.
• Replacement of the four original Lewmar deck winches (44ST and 48ST) with four Andersen 50ST self-tailing winches.
2026 – Scheduled Haul-out at RCS Raiatea (17 August)
• Replacement of the hydraulic steering pump.

2026 - Haul out in Raiatea on 17th august
. replacement of hydraulic steering pump (done in HAO in may
. General check, rudder adjustement, antifouling...